luckywp-table-of-contents
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sustainablesavin/public_html/wp-includes/functions.php on line 6114Adelaide<\/p>\n<\/div><\/div><\/div><\/div><\/div>
Built in 2009 Aurora on Pirie is located in Adelaide\u2019s prime CBD area, opposite Hindmarsh Square.<\/p>\n
Comprising over 190 office suites with a diverse and eclectic variety of businesses.<\/p>\n<\/div>
Although Aurora on Pirie is one of Adelaide\u2019s most desirable corporate locations, attracting commercial tenancies is increasingly competitive. Reducing outgoings, specifically lowering energy costs, is one way to attract and retain high-value tenants.<\/p>\n
After an extensive engineering study, a comprehensive holistic energy solution was deployed. This solution included: embedding the whole building, power factor correction, sensors for lights in fire exit stairwells, 25kW roof top solar, 3 BMS strategy changes, VSD\u2019s on HVAC water pumps and finally two stages of bill re-engineering.<\/p>\n<\/div><\/div><\/div>